Add loop to analysis schedule and enable it

1.  Click “Read Schedule” which will bring back the controller already scheduled and the controller not scheduled (“No” in column “Enable Analysis”)

2.  Click on the dropdown list box to change the “No” to “Yes”

3.  Click “Save Schedule” and these two rows shall turn green

4.  Notice that auto-generated schedule ID is brought back to the first column.

5.  Double check loops are successfully written into the schedule database by clicking “Read Schedule” again.

6.  You can put a new analysis span to override the default time span for a loop type you just specified.